Friday, October 23, 2015

Charles River: Logging preliminary photos - second group of photos

Charles River: Logging preliminary photos - second group of photos.

1. Summary.
2. Destruction plans.
3. Photos from 10/22/15.
4. Past Reports in THIS series, and a communication showing everything to a bad city council.


1. Summary.

This is the most recent report on the imminent logging by the Department of Conservation and Recreation on Memorial Drive on the Charles River.

My blog will not handle all the photos at once.  So I am presenting them in sequence.  This report will start with the destruction plans for the area, which I could not fit in the original report, then resume the actual photos, to the extent that is possible.

Really, it is not possible to resume the photos.  I guess I will have to do two reports at a time to get in all the photos of this outrage.


2. Destruction plans.

Here are the plans for destruction in the area covered by the photos.  Much more destruction is included in the plans than is shown here.  A link to the total plans begins section 4, below.

The blackened circles are healthy trees condemned for destruction.

Not able to fit in in first report.











3. Photos from 10/22/15.

I am resuming from group 1 with photos, insofar as I can publish them, and will proceed again after ward.

As stated, this will have to resume with the third report of photos.  Two reports at a time, and I am overloading my blog.


4. Past Reports in THIS series, and a communication showing everything to a bad city council.

a. DCR Destruction Plans as provided to Cambridge City Council by me on April 1, 2014, full publication of plans in post: http://charlesriverwhitegeeseblog.blogspot.com/2014/04/tree-destruction-plans-charles-river.html
b. Report 1.  Charles River:  Massive Tree Destruction Appears Imminent on Memorial Drive, October 4, 2015.  http://charlesriverwhitegeeseblog.blogspot.com/2015/10/charles-river-massive-tree-destruction.html.
c. Report 2.  Memorial Drive Plans and Photos, October 5, 2015 http://charlesriverwhitegeeseblog.blogspot.com/2015/10/charles-river-memorial-drive-logging.html
d. Report 3. Charles River: CURRENT Memorial Drive Construction Zone, October 6, 2015, http://charlesriverwhitegeeseblog.blogspot.com/2015/10/charles-river-photos-current-memorial.html
e. Report 4. Charles River: Photos, CURRENT Memorial Drive Construction Zone and Major Likely Victims, October 8, 2015, http://charlesriverwhitegeeseblog.blogspot.com/2015/10/charles-river-photos-current-memorial.html
f. Report 5.  Flash: DCR Going Ahead with Massive Destruction on Memorial Drive, October 22, 2015, http://charlesriverwhitegeeseblog.blogspot.com/2015/10/charles-river-flash-dcr-going-ahead.html
g. Report 6. Charles River: Logging preliminary photos - first group of photos October 23, 2015, http://charlesriverwhitegeeseblog.blogspot.com/2015/10/charles-river-logging-preliminary.html